Revitalizing Hochelaga-Maisonneuve

A transit-led redevelopment proposal connecting industrial land, new neighbourhood streets, and a more accessible public realm.

Location
Montréal, Québec
Study area
Approximately 42 hectares
Course
URBS 433 · Team capstone
Deliverables
GIS analysis, 3D models, technical report

Methods & skills

  • ArcGIS Pro
  • Slope profiling
  • Transit coverage
  • Land-use planning
  • SketchUp
  • Technical reporting

A year-long team capstone at Concordia University. Figures present the team's proposal.

Illustrated team redevelopment proposal for Hochelaga-Maisonneuve.
The capstone proposal places new development within the surrounding Montréal street and transit network.
In this report 7 min read

Background and objective

Hochelaga-Maisonneuve’s industrial history has left large parcels, brownfield sites, and gaps in the street network. The team examined how approximately 42 hectares of industrial land could become a mixed-use district connected to the surrounding neighbourhood and its major destinations, including the Olympic Stadium and Botanical Garden.

The proposal brings together land-use planning, transit accessibility, and urban design. Its central question is how a new tram connection, a finer street network, and green infrastructure could support redevelopment while addressing the site’s physical constraints. It is an academic planning proposal, with future engineering and implementation requirements remaining to be resolved.

Study area and redevelopment focus from the capstone report.

Site analysis

The site analysis combined GIS mapping, land-use observation, historical research, and ecological context. Historic development along Notre-Dame Street, former agricultural divisions, industrial buildings, and rail infrastructure help explain the present parcel pattern. The loss of historic waterways and extensive hard surfaces informed the report’s attention to stormwater and green infrastructure.

Historical and ecological features used to interpret site conditions.

Large industrial plots and limited vegetation create both redevelopment opportunities and constraints. The report identifies manufacturing, storage, and distribution uses associated with the area’s industrial and port functions. Reuse would need to address these existing activities alongside environmental remediation and connections to adjacent residential areas.

Industrial parcels and brownfield context within the study area.

Redevelopment vision

The vision is a district where housing, employment, public space, and everyday services reinforce one another. The proposal extends the surrounding street fabric into large industrial parcels and uses transit access to support a denser mix of uses.

  • Transit-oriented development: connect the site to a proposed tram line and the broader transit network.
  • Urban integration: replace isolated large parcels with smaller blocks and connected walking routes.
  • Public realm and green infrastructure: combine gathering spaces, vegetation, and stormwater considerations.
  • Everyday activity: pair housing and employment with commercial, cultural, and recreational destinations that can support use beyond major events.
Overall redevelopment vision, showing the relationship between new built form and its surroundings.

Transit analysis

A tram connection could link the redevelopment area to the rest of Montréal. Choosing a route meant weighing gaps in service against the streets and slopes the tram would have to cross.

Existing network

The existing métro stops and bus lanes establish where service is concentrated. The team used this network as the starting point for comparing tram routes.

Earlier alignment

The capstone describes an earlier alignment on Honoré-Beaugrand, L’Assomption and Hochelaga that the 2024 PSE study rejected. Frequent driveways and a narrow right-of-way constrained Honoré-Beaugrand. Steep grades on L’Assomption added an engineering challenge.

Proposed Viau alignment

The team proposed a route along Hochelaga and Viau, with a tunnel through the steeper section. The aim was to improve east–west access and connect redevelopment areas to transit more equitably.

Slope feasibility

Slope profiling was used to compare L’Assomption Boulevard and Viau Street. The study’s charts use a 6% reference threshold and show sections of L’Assomption approaching 14%. These profiles informed the comparison of surface routes and grade-separated options; they do not establish final engineering feasibility.

The team proposed a tunnel segment on Viau to manage steep sections and limit disruption at the surface. This connects terrain analysis to a planning decision: where the alignment should run, and where surface infrastructure may be difficult to accommodate.

Mapped terrain conditions used to compare the two corridors.

What the slopes reveal

Viau Street

The team used the Viau Street profile to identify where a tunnel could help the tram manage the terrain. The 6% reference line gives both profiles a common point of comparison.

Assomption Boulevard

Parts of the boulevard approach a 14% grade. Read against the same 6% reference line, the profile shows why a surface alignment here would need further engineering analysis.

Transit coverage

The team used 500-metre buffers to compare the proposed tram stops with existing métro coverage. The report identifies areas that could gain access around Ontario Street, Pierre-de-Coubertin, and the southern portion of the study area. Buffer coverage provides a spatial screening measure; it should not be read as a measured journey time or a detailed pedestrian network model.

Proposed stop locations and their relationship to existing transit.
The report's 500-metre transit coverage analysis.

The report also relates the alignment to Montréal’s 2022 climate sensitivity mapping. Green tracks and planted corridors are proposed as part of a mobility strategy that considers heat and stormwater alongside access to schools, parks, and commercial areas.

Streets and built form

The development framework translates the planning strategy into blocks, open spaces, and a street hierarchy.

Reconnect the district

The 3D model shows how the proposed blocks fit into the surrounding city. It establishes the overall street pattern before the plan turns to individual plots.

Make room within the blocks

The proposal divides large industrial parcels into smaller blocks. Green spaces within them would support green infrastructure and provide shared outdoor space for a denser mix of uses.

Give the blocks a street network

The team retained key streets and introduced a hierarchy of new connections for walking and other modes. A shared street intersects Pierre de Coubertin and Hochelaga. The proposed streets target a typical width of 28.4 metres.

Land use

The land-use plan combines a predominantly residential district with mixed-use, institutional, industrial, and commercial functions. A proposed commercial corridor along Pierre-de-Coubertin connects to the tram and shared street. Industrial and institutional uses are concentrated toward the north to manage their relationship with housing.

3D massing and thematic mapping make these relationships visible at both district and block scales. The following areas reproduce the source report’s land-use table.

The proposed district

Land use at a glance

Select a category to read how it fits into the plan.

Select a land-use category for its planning context.

Percentages reproduce the report’s rounded narrative distribution; areas reproduce its land-use table. Percentages are not recalculated from the area values.

Proposed land-use areas · colours match the maps
Land useArea (m²)
Commercial11,794
Industrial19,087
Institutional25,432
Mixed-use75,076
Residential231,726
3D land-use model from the team report.
Land-use distribution and its relationship to the street network.

Building heights

The proposed height strategy ranges from 3–4 storeys for residential buildings to 5–6 storeys for mixed-use buildings, with 11–12-storey buildings at selected edges near green spaces. The report describes a land-use mix of 64% residential, 21% mixed-use, 7% institutional, 5% industrial, and 3% commercial.

Proposed building heights and their spatial distribution.
New dwellings · narrative12,574Proposed new housing
Population increase31,220Projected additional residents
Residential buildings3–4Proposed storeys
Selected peripheral buildings11–12Proposed storeys

Proposed scenario, not completed development. The report separately lists 13,574 total dwellings in its table; it does not reconcile this with the 12,574 new dwellings in its narrative.

The report’s narrative projects 12,574 new dwellings and a population increase of 31,220. Its land-use table separately lists 13,574 total dwellings. These source labels are preserved here; the report does not reconcile the difference between the two dwelling figures. All figures describe the proposed scenario, rather than completed development.

The public PDF omits teammate and instructor names for privacy.